NSC-Oman
  • Home
  • About Us
  • Products & Services
  • Projects
  • News
  • Partners
  • Contact Us
  • Social media |

Our Latest News

Know The Latest NSC News And Make A Direct Contact With Us

Ad Dakhiliyah Water Transmission System Phase 1

14/7/2020

Comments

 
A contract was awarded to
1-Reinforcement of the Existing Ad Dakhiliyah Water Transmission System
​Phase 1 – Short Term Works (Tender No.81/2017)Electro-chlorination system


Picture

WE HAVE SELECTED THREE ELECTROCHLORGEN MODEL FOR THESE FOUR SITES (MPS, BPS 1, BPS 2 & BPS 3)
1. EASYCHLOROGEN(EC) 4250 MODEL – CAPACITY IS 4250 G/HR
2. EASYCHLOROGEN(EC) 2200 MODEL – CAPACITY IS 2200 G/HR
3. EASYCHLOROGEN(EC) 1100 MODEL – CAPACITY IS 1100 G/HR

​Total Numbers of EASYCHLOROGEN 12 Units in different capacity all over project :


MAIN PUMPING STATION (MPS)ONSITE HYPO PRODUCTION UNIT SELECTED (3 TRAIN)
2 NO’S OF EASYCHLOROGEN 4250 &
1NO OF EASYCHLOROGEN2200 MODEL
BOOSTER PUMPING STATION (BPS 1)ONSITE HYPO PRODUCTION UNIT SELECTED (3 TRAIN)
2 NO’S OF EASYCHLOROGEN 4250 &
1 NO OF EASYCHLOROGEN2200 MODEL
 
BOOSTER PUMPING STATION (BPS 2)ONSITE HYPO PRODUCTION UNIT SELECTED
(3 TRAIN)
 
2 NO’S OF EASYCHLOROGEN 4250 &
1NO OF EASYCHLOROGEN 1100 MODEL
 
4.BOOSTER PUMPING STATION (BPS 3)
ONSITE HYPO PRODUCTION UNIT SELECTED
(3 TRAINS)
3 NO’S OF EASYCHLOROGEN 2200 MODEL
Comments

    Commenting

    Please read our Comment Policy before commenting.

    Read Now
  • Home
  • About Us
  • Products & Services
  • Projects
  • News
  • Partners
  • Contact Us
  • Social media |
  Powered by BlackOx Designer